This state-of-the-art facility will span 37,500 square feet, with 36,000 square feet dedicated to hangar space and 1,500 square feet of office accommodations.
- Our vertically integrated approach leverages Tetra Development’s partnership with Tetra Steel Worx, ensuring seamless coordination of structural engineering, steel fabrication, and erection.
This proposal outlines our construction methodology, timeline, and detailed cost breakdown, demonstrating our commitment to delivering exceptional value through multi-craft accountability and accelerated construction processes.
Hangar Dimensions & Specifications
Office Accommodations
1,500 square feet of modern office space integrated into the facility, featuring climate-controlled workstations, conference areas, and technical planning rooms to support maintenance
operations.
Main Hangar Space
36,000 square feet of clear-span hangar space designed to accommodate multiple aircraft with a 30-foot clear height and 180-foot door clearance width.
Hangar Dimensions & Specifications
The comprehensive site plan illustrates the strategic positioning of the 37,500 square foot OMNI Air Transport Maintenance Hangar adjacent to American Airlines Hangar 80.
- This carefully designed layout optimizes aircraft movement patterns, integrates necessary infrastructure connections, and provides efficient access to taxiways X and Runway Y
- The plan demonstrates our thoughtful approach to spatial organization, ensuring both operational efficiency and compliance with aviation facility requirements.
Project Overview
and Specifications
Facility Specifications
- Total Facility: 37,500 sq ft
- Hangar Space: 36,000 sq ft
- 180’x30′ Hangar Door Opening
- Office Space: 1,500 sq ft
- Construction Timeline: 10-14 months
Key Features
- Pre-Engineered Metal Building (PEMB)
- Custom Hangar Doors
- Pre-Action Fire Suppression System
- Modern Office Facilities
- Complete Site Development
Financial Highlights
- Total Project Cost: $6,031,620
- Cost Per Square Foot: $160.84
- TIF Available: 1% of project cost annually for 20 years
- NMTC possible at 20% of cost basis
- Longterm lease option at $16 psf